26/3/2024 0 Comments 26th MarchAfter weeks of ripping out the old floor, pumping out oily water from the bilge and de-greasing the hull, preparing wood at home and varnishing it, I *finally* got some floor boards laid. Still a lot to do. The three slightly wonky looking boards with cuts across will be fixed together and providing with a recessed handle so they can be lifted out in one piece to gain access to the prop-shaft stuffing box. To the left of the second picture there's still a gap between floor board and skirting (and the skirting needs painting). The wedge supporting the cupboard will go once there are floor boards under the cupboard's legs.
Final touch will be to make 'rag rugs' to provide a warmer, softer surface.
0 Comments
Leave a Reply. |
AuthorPhil, owner, captain, chief engineer, electrician, carpenter, cook and comms manager of Seren Archives
April 2024
Categories |