15/12/2023 0 Comments December 15thIt's a week since I last went to Crick so here's a quick update. The gas locker is done apart from some paint on the bulkhead behind and some safety stickers. The water heater works but the thermostat is dodgy. The water was 15°C when I arrived, which is better than freezing but means I'm wasting electricity. I turned it down a little so we'll see how it goes. I ripped some more floor out but there's still quite a lot to do.
0 Comments
Leave a Reply. |
AuthorPhil, owner, captain, chief engineer, electrician, carpenter, cook and comms manager of Seren Archives
April 2024
Categories |